Burrard Civic Marina Community Association
Change.org Petition
  • News and Progress
  • About Us
  • Documents
    • Marina History
    • Marina Fees
    • Environment
    • Meeting minutes
    • BCMCA Capital Plan Submission (2018)
    • Other Marinas
    • Parks Board Documents >
      • 2016-18 Marina Renewal Project
  • Membership Information
    • Membership Information Form
    • Membership Renewal
  • Contact
  • WEB MAPS
    • Burrard Marina Web Map
    • Marinas of Greater Vancouver
    • False Creek Sewer Networks

Marina Renewal Meeting

6/16/2016

0 Comments

 
On June 2, the Parks Board hosted a meeting about the Marina Renewal Project, at the West End Community Centre. Approximately 40-50 people attended the meeting. A presentation on the project to date was put on by Sev Aurajo, the new Parks Board manager, and Robert Dullanty, an engineer with Advisian (a division of Worley Parsons), the engineering consulting firm. 

Reliable power and water supply had been seen as the highest priority, so much of the investigation focussed on these items, as well as problems with dock infrastructure (floats and pilings), wake from passing boats, ramps, dredging, and so on. An early finding was that both the power and water systems are old and overtaxed. The power supply needs to be replaced from the source (a transformer shed west of Harmony Grove Park) including all underground cabling. This is fairly expensive, and doesn't leave a lot of money left for other improvements.

Two options were presented:

Option A - which proposed electrical and water upgrades to docks M through T, on the basis that some customers could see some immediate improvements, and if docks themselves could not be replaced, then these improvements should be limited to only the newest docks in the marina (which are already 30 years old). 

Option B - proposed replacement of the "head float", or main float connecting all the rest of the docks in the south-east basin. (G to L float). This would provide a new "backbone" for this part of the marina, wider floats, new pilings, and new water and power service embedded within the floats. This would make it much easier for future replacement of other docks as and when money becomes available in future Capital Plans. 

While neither option goes nearly far enough for many of the desperately needed improvements we would like to see, it was clear at the meeting that the vast majority of attendees thought Option B was the better plan. As such, the Parks Board and engineers will move forward with Option B, and refine the scope of work and schedule. The Parks Board has promised a follow-up meeting soon to brief marina customers on how the project will proceed from here.

A copy of the meeting presentation is available here:
burrard_marina_user_group_presentation_-_final_june_2_2016.pdf
File Size: 3606 kb
File Type: pdf
Download File

0 Comments



Leave a Reply.

    Picture
    Please Sign our Change.org Petition Here


    ​

    Archives

    October 2022
    March 2021
    March 2019
    January 2019
    November 2018
    October 2018
    April 2018
    March 2018
    February 2018
    January 2018
    November 2017
    June 2017
    February 2017
    July 2016
    June 2016
    April 2016
    October 2015
    August 2015
    September 2014
    June 2014
    April 2014

    Categories

    All

    RSS Feed

Powered by Create your own unique website with customizable templates.