Burrard Civic Marina Community Association
Change.org Petition
  • News and Progress
  • About Us
  • Documents
    • Marina History
    • Marina Fees
    • Environment
    • Meeting minutes
    • BCMCA Capital Plan Submission (2018)
    • Other Marinas
    • Parks Board Documents >
      • 2016-18 Marina Renewal Project
  • Membership Information
    • Membership Information Form
    • Membership Renewal
  • Contact
  • WEB MAPS
    • Burrard Marina Web Map
    • Marinas of Greater Vancouver
    • False Creek Sewer Networks

Marina Renewal Study

8/5/2015

0 Comments

 
The Marina Renewal Study is currently under way. A Request For Proposals (RFP) was issued by the City on March 6, 2015. Documents are currently still available at this link:

http://former.vancouver.ca/fs/bid/bidopp/RFP/PS20141139-RFP.htm

The contract was awarded in June to the firm of Worley Parsons.  To date, the following has been completed:

- Review of the previous condition assessment report and resent work completed at the marina. - Climatic and Metocean Surveys for the marina.

- Additional scope of work to prepare a Bathymetric Survey of the marina to understand the water depths and estimated sediment that has been deposited over the years since the previous dredging.

In progress:

- Engineering reviews of the water and fire alarm systems
- Wave analysis
- Analysis of the existing 15 amp electrical service, feasibility of upgrading, and consideration of 30 amp service for parts of the marina.
- Concept for float replacement.
- Consideration for dredging. (will require additional environmental review, soil testing, and disposal costs)

Additional work already completed:

- New 10 foot high, heavier guage chain-link perimeter fence along back of parking area.
- New intruder alarm security devices in portions of the marina building.
- New CCTV cameras installed, and in process of being put into operation.

The consultant team is to complete a site analysis of the issues and will attend a meeting with the user group (survey) to understand the user group's desires, aspirations and vision for the marina’s infrastructure and to consider the short, medium and long-term future strategies.  The consultant team will develop a workable schematic strategy for further engagement from your group for feedback this summer.

0 Comments



Leave a Reply.

    Picture
    Please Sign our Change.org Petition Here


    ​

    Archives

    October 2022
    March 2021
    March 2019
    January 2019
    November 2018
    October 2018
    April 2018
    March 2018
    February 2018
    January 2018
    November 2017
    June 2017
    February 2017
    July 2016
    June 2016
    April 2016
    October 2015
    August 2015
    September 2014
    June 2014
    April 2014

    Categories

    All

    RSS Feed

Powered by Create your own unique website with customizable templates.